Kitchens · Baths · Whole floors · Collin County

Built once.
Built right.

Design-build remodeling with one project manager from first sketch to final walkthrough, and a fixed price you sign before demo day.

Plan your budget →

Remodels go wrong in the gaps between people.

01

Design and build under one roof

The person who draws your kitchen is on the same team as the crew that builds it. Nothing gets lost between a designer and a contractor.

02

Selections before demo

Every tile, fixture and cabinet door is chosen and ordered before we pull up your floor. No six-week pause mid-project.

03

A fixed price you sign once

Changes only happen if you ask for them, in writing, with the cost shown before you say yes.

Budget planner

What will it actually cost?

Ranges for North Dallas suburbs, not national averages. Pick a project and finish level to see a typical range, a timeline and where the money goes.

Project
Size
Finish level
Typical investment

Ranges cover design, materials, labor and permits. Your fixed price comes after a site visit and selections.

Get a fixed quote →
Finish studio

Try it before you tile it.

Tap the swatches to restyle the elevation. This is the same palette conversation we have at the selections table, minus the forty sample boxes.

Cabinets
Counter
Hardware

The process

Four phases. No surprises.

A typical kitchen takes ten to fourteen weeks from first meeting to final walkthrough. About half of that is design and ordering, before anything in your house changes.

Weeks 1–3

Design

Measure, sketch, revise. You see the 3D plan before anything is priced.

  • In-home consult
  • Measured drawings
  • 3D renderings
Weeks 3–6

Selections

Tile, stone, cabinets and fixtures, chosen together at our showroom.

  • Fixed-price contract
  • Everything ordered
  • Permits pulled
Weeks 7–13

Build

Dust walls up, a daily cleanup, and a Friday photo update by text.

  • One project manager
  • Same crew start to finish
  • City inspections
Week 14

Walkthrough

We fix every item on your punch list, then hand over the warranty binder.

  • Punch list sign-off
  • Care guide for finishes
  • 2-year warranty
In writing

Promises with numbers on them.

Vague promises are easy to make. These go into your contract.

0

Change orders we didn't ask you about

Any change to scope or price needs your signature first. If we miss something we should have caught, that's on us.

24h

Reply time, every time

Your project manager answers within one business day, and you'll always know who to call.

2 yrs

Workmanship warranty

Double the one-year standard. If something we built fails, we come back and fix it.

Questions

Good to know.

Can we live at home during a kitchen remodel?

Most families do. We seal the work zone with dust walls, set up a temporary kitchen corner if you'd like one, and keep a clear path through the house.

How is a fixed price possible?

Because every selection is made and ordered before demo. The only open risk is what's behind your walls, and we explain on day one how we handle anything we find there.

Do you handle HOA approval?

Yes. We prepare the drawings and paperwork most HOAs in Collin County ask for, and we submit permits with the city.

Do you offer financing?

We work with a local lender who offers home improvement loans. Many clients also use a home equity line. We'll give you the payment schedule early so you can plan.

Let's draw your plan.

A 60-minute in-home consult with a designer. We measure, listen and send a ballpark range within a week. Serving McKinney, Frisco, Prosper, Allen and Celina.

Call or text(214) 555-0186
Book a design consult →Showroom visits Tuesday to Saturday, by appointment.
CallBudget planner